Cadder Yard: A HST servicing depot is to be constructed in two stages on the Down Yard, connected to the Down Arrival/Down Departure Line. The access tracks and Cadder Down Yard will be temporarily removed during the work. Stage 1 includes two reception roads (Roads 1 & 2), Controlled Emission Toilet facilities, a refuelling area, an extended headshunt (Road '0') at the Glasgow (west) end
and Depot Roads 4-6 at the east end. It is due to be ready for Dec 2020 for planned timetable changes. Stage 2, due in May 2021, adds Roads 3,7&8. (Roads 3-8 serve three double sided cleaning platforms.)
Thanks to a friends sending Branch Line News
This work has already started
What I could see from distance. Had to use a 300mm tele lens
21/06/2020 there was a Story Colmar Unit and as far as I could see RRB01 with a VAC module unit fitted were parked up Day Time and being a Sunday
So anyone traveling by train between Lenzie & Bishopbriggs may have something to see